Sign In | Join Free | My portofva.com |
|
Brand Name : CHBEST
Model Number : XY50x30
Certification : CE/BV/SGS
Place of Origin : China Hebei
MOQ : 1 set
Supply Ability : 20 sets/month
Delivery Time : 30-40 days
Packaging Details : plastic film for naked machine
Product name : High Speed Double Line Stud and Track Roll Forming Machine/Main Channel/Drywall
Color : Blue or according to your requirement
Control system : PLC
Cutting type : Non-stop cutting
Warranty : 2 years
Lifetime : 10years
Technical Detail
Roller station | 12Steps |
Under Frame | 40mm-0.01~-0.03(with key-way) |
Shaft diameter(Solid) | 40mm-0.01~-0.03(with key-way) |
Shaft material(Hard) | High grade 45# steel,heated and quenched,cylindrical grinding, |
Roller material(Hard) | Cr12,heated and Quenched,polishing |
Bearing Type | Standard |
Transmission Gear | Heat treatment |
Motor Power | 5.5KW(Lichao,Shanghai) |
Forming Speed | 0-20m/min(Non-Stop) |
Main Structure | Welded Structural Steel |
Hydraulic Cutting | Tracking Length To Cut |
Pump power | 5.5 KW |
Hydraulic pressure | 20 Mpa |
Voltage Standard | 380V/3Phases/50Hz |
Cutting die | Cr12Mov, Quenched processed |
Service
In correct operation & maintaining, the machine is guaranteed for 18 months since leaving our
factory excludes the electric elements.
Installation:If installation is needed, we will dispatch a technician to the buyer’s factory abroad to assist
regulating the machine with charge. The buyer should assist the technician to get the Chinese technician's
visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the
buyer shall make the following preparation before arrival of technicians.
* Position the machine in the buyer’s factory.
* Prepare necessary electric wiring.
* Prepare material of trial running.
* Provide labors for assistance and installation during instalation.
![]() |
Double Line Stud And Track Roll Forming Machine For Main Channel / Drywall Images |